![](http://taha.unm.edu/wp-content/uploads/2018/10/1-300x138.jpg)
FRP strengthening of Whitemud bridge Edmonton, Canada (2015)
![](http://taha.unm.edu/wp-content/uploads/2018/10/2-300x224.jpg)
FRP shear strengthening of Gaetz Bridge, Red Deer, Canada (2011)
![](http://taha.unm.edu/wp-content/uploads/2018/10/4-300x226.jpg)
FRP/polymer concrete strengthening, Ahmadi bridge, Kuwait (2007)
![](http://taha.unm.edu/wp-content/uploads/2018/10/5-300x225.jpg)
FRP strengthening of Calgary Saddledome roof, Calgary, Canada (2003)
.
Construction design of Saint Patrick’s pedestrian bridge, Calgary, Canada (2012)
![](http://taha.unm.edu/wp-content/uploads/2018/10/7-300x190.jpg)
Assessment and repair of Dhahran tunnel, Saudi Arabia (2015)
![](http://taha.unm.edu/wp-content/uploads/2018/10/8-300x141.jpg)
Structural design of Hamriyah pump station and bridges, Dubai, UAE (2012)
![](http://taha.unm.edu/wp-content/uploads/2018/10/9-300x228.jpg)
Structural health monitoring of Tucumcari bridge, New Mexico (2010)
![](http://taha.unm.edu/wp-content/uploads/2018/10/10-300x199.jpg)
Structural design of Canyon Meadows LRT Station and Pedestrian Bridge, Calgary, Canada (2001)
![](http://taha.unm.edu/wp-content/uploads/2018/10/12-300x232.jpg)
Assessment and repair of water intake structure, Saudi Arabia (2010)
![](http://taha.unm.edu/wp-content/uploads/2018/10/13-300x196.jpg)
FRP strengthening of inner slabs, Calgary, Canada (2000)